|
a. POWER SUPPLY
(Note: Electrical Connection should be in the name of the ITI/ Management/Owner of premises)
|
1
|
Electrical Connection issued in the name of
|
Vivekanand Pvt. Industrial training Institute
|
|
2
|
Latest Electricity bill details(enclosed-Units consumed /one year bill))
|
Letest Electricity bill enclosed
|
|
3
|
Trade
|
Maximum no. of unit in one shift
|
Power supply required as per norms in KW
|
Power supply available in the Institute in KW
|
|
Electrician
|
02
|
5.20
|
13.00
|
|
Mechanic Diesel
|
01
|
5.00
|
13
|
|
|
|
|
|
|
Total electrical Load
|
10.20
|
13.00
|
| |
|
|
|
|
|
|